Pareto Analysis of Loss Output in Geothermal Power Plant Equipment for Prioritizing Auxiliary Equipment Investment Based on Operational Redundancy
Keywords:
geothermal power plant, loss output, maintenance operational efficiency, Pareto analysisAbstract
This study aims to perform a Pareto analysis of output loss in Geothermal Power Plant equipment to identify priority investments in auxiliary equipment based on operational redundancy. The Pareto method is used to analyze the contribution of each piece of equipment to output loss and determine which equipment should be prioritized for further investment. The analysis shows that 20% of equipment, such as cooling towers and pumps, contributes the most to output loss. Based on these findings, it is recommended that investment should be focused on equipment that significantly impacts Geothermal Power Plant performance, with the goal of improving operational efficiency and reducing downtime. The Efficiency Optimization System (EOS) is used to monitor the performance of the plant in near real-time, identify inefficiencies, and provide improvement recommendations based on Pareto analysis to support decision-making in maintenance and investment.
Downloads
References
A. D. Anggareni, R. M. Nurbasari, and M. I. Ikhsan, Cost Optimization of Compressor Damage with the Overall Equipment Effectiveness (OEE) and Reliability Centered Maintenance (RCM) Methods, SINERGI, vol. 27, no. 3, pp. 296-304, 2023, doi: 10.22441/sinergi.2023.3.003.
A. N. D. E. Ariyanto, R. R. Putra, and H. Hasbullah, Failure Mode and Effect Analysis (FMEA) in Reliability Centered Maintenance (RCM) as Risk Management, SINERGI, vol. 27, no. 1, pp. 69-76, 2023, doi: 10.22441/sinergi.2023.1.007.
Arslan, Pareto principle-based advanced exergetic evaluation of geothermal district heating system: Simav case study, Turkey, 2022.
Y. M. Astuti and A. S. Hadi, Implementation of Reliability Centered Maintenance (RCM) on Substation Electrical Equipment to Minimize Risk of Breakdown and Increase Equipment Reliability, in ICITAC 2022, pp. 111-120, 2023, doi: 10.2991/978-2-494069-07-7_16.
R. S. Atlason, Innovation and development in geothermal turbine maintenance based on Icelandic experience, Iceland, 2015.
D. Badrazamani, Implementasi Metode Pengukuran OEE pada Pembangkit Listrik Menggunakan Standar Event Status, Equipment Cause dan Failure Mode Pada NERC. 2024.
K. C. Amrita, Analisis Thermal pada Pembangkit Listrik Tenaga Panas Bumi PT. Indonesia Power UPJP Kamojang, Surabaya, 2018.
A. O. Nwajana, G. O. Egbe, S. N. Arinze, S. H. Ebenuwa, and E. R. Obi, Maintenance Resources Optimization Using Pareto Analysis: Instrumentation Air Compressor in Oredo, Nigeria, International Journal of Manufacturing, Materials, and Mechanical Engineering, vol. 13, no. 1, 2024.
PLN Nusantara Power, Laporan Implementasi Digital Power Plant PLTU Indramayu Januari 2025, Jakarta, 2023.
R. E. Putri, I. K. M. Gata, N. Kurniati, and I. Y. Permana, Optimizing Preventive Maintenance Scheduling for Compressor Using Reliability Centered Maintenance (RCM) Method in PT XYZ, IJITE J. Innov. Technol. Eng., vol. 2, no. 1, pp. 29-41, 2023.
M. A. Wibisono, Y. Maulana, and C. Rosyanti, Optimizing Preventive Maintenance Scheduling Using Reliability Centered Maintenance (RCM) on Air Compressor, in Proceeding of Engineering and Industrial Technology, pp. 287-293, 2022.
S. J. Zarrouk and H. Moon, Efficiency of geothermal power plants: A worldwide review, Geothermics, vol. 51, pp. 142-153, 2014.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 ITB Graduate School Conference

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.