Quickly Understanding of Lean Construction to Improve Project Cost Performance: A Literature Review
Keywords:
construction project, cost performance, high-rise building, lean construction, wasteAbstract
The study focuses on understanding construction projects' waste and cost performance through a lean construction approach. Concentrate on the following lean construction literature proposes a framework text to explain construction waste activities that result in the need to optimize work breakdown structures to create good construction cost performance. This framework consists of a series of interrelated processes by describing construction waste activities that occur by identifying three stages: evaluation and elimination of wasteful activities, optimization of work breakdown structures, and improved cost performance. While acknowledging the existing literature, the paper focuses more on the lean thinking of such wasteful construction activities by emphasizing lean construction mechanisms that will positively impact project cost performance.
Downloads
References
H. Abou Chakra dan A. Ashi, "Comparative analysis of design/build and design/bid/build project delivery systems in Lebanon," J. Ind. Eng. Int., vol. 15, no. s1, pp. 147–152, 2019, DOI: 10.1007/s40092-019-00323-1.
I. Maradzano, R. A. Dondofema, dan S. Matope, "Application of lean principles in the south african construction industry," South African J. Ind. Eng., vol. 30, no. 3, pp. 210–223, 2019, DOI 10.7166/30-3-2240.
L. Zhao, Z. Liu, dan J. Mbachu, "Optimization of the supplier selection process in prefabrication using BIM," Buildings, vol. 9, no. 10, pp. 1–18, 2019, DOI 10.3390/buildings9100222.
G. Thing Leo, A. Mebarki, F. Claude, C. Gobin, dan R. El Meouche, "On the quality of buildings and construction projects: Metrics and process dynamics," J. Inf. Technol. Constr., vol. 26, no. December 2019, pp. 174–192, 2021, DOI 10.36680/j.itcon.2021.011.
A. M. Raouf dan S. G. Al-Ghamdi, "Managerial practitioners' perspectives on quality performance of green-building projects,"Buildings, vol. 10, no. 4, 2020, DOI 10.3390/BUILDINGS10040071.
A. Prihantoro dan A. E. Husin, "Value increase of jetty project based on system dynamics," Civ. Eng. Archit., vol. 9, no. 3, pp. 892–898, 2021, DOI: 10.13189/CEA.2021.090331.
A. M. Al-Janabi, M. S. Abdel-Monem, dan K. M. El-Dash, "Factors causing rework and their impact on projects' performance in Egypt," J. Civ. Eng. Manag., vol. 26, no. 7, pp. 666–689, 2020, DOI: 10.3846/jcem.2020.12916.
E. Bruun, D. Allen, dan M. Givoni, "Choosing the right public transport solution based on performance of components," Transport, vol. 33, no. 4, pp. 1017–1029, 2018, DOI 10.3846/transport.2018.6157.
A. Rosarius dan B. García De Soto, "On-site factories to support lean principles and industrialized construction," Organ. Technol. Manag. Constr., vol. 13, no. 1, pp. 2353–2366, 2021, DOI 10.2478/otmcj-2021-0004.
G. Mosey dan B. Deal, "Optimizing multi-family building massing for affordability and envelope performance: an investigation of the trade-offs implicit in low rise residential buildings," Buildings, vol. 11, no. 3, 2021, DOI: 10.3390/buildings11030099.
A. M. Bascoul, I. D. Tommelein, dan D. Douthett, "Visual Management of Daily Construction Site Space Use," Front. Built Environ., vol. 6, no. September, pp. 1–13, 2020, DOI 10.3389/fbuil.2020.00139.
C. C. Wang, S. M. E. Sepasgozar, M. Wang, J. Sun, dan X. Ning, "Green performance evaluation system for energy-efficiency-based planning for construction site layout," Energies, vol. 12, no. 24, pp. 1–21, 2019, DOI: 10.3390/en12244620.
J. Kim, D. Seo, dan Y. S. Chung, "An integrated methodological analysis for the highest best use of big data-based real estate development," Sustain., vol. 12, no. 3, 2020, DOI 10.3390/su12031144.
I. Bertin, R. Mesnil, J. M. Jaeger, A. Feraille, dan R. Le Roy, "A BIM-based framework and databank for reusing load-bearing structural elements," Sustain., vol. 12, no. 8, pp. 1–24, 2020, DOI: 10.3390/SU12083147.
B. Manzoor, I. Othman, J. C. Pomares, dan H. Y. Chong, "A research framework of mitigating construction accidents in high-rise building projects via integrating building information modeling with emerging digital technologies," Appl. Sci., vol. 11, no. 18, 2021, DOI: 10.3390/app11188359.
J. M. Kim, J. Bae, S. Son, K. Son, dan S. G. Yum, "Development of model to predict natural disaster-induced financial losses for construction projects using deep learning techniques," Sustain., vol. 13, no. 9, 2021, DOI: 10.3390/su13095304.
Syafrimaini dan A. E. Husin, "Implementation of lean six sigma method in high-rise residential building projects," Civ. Eng. Archit., vol. 9, no. 4, pp. 1228–1236, 2021, DOI 10.13189/cea.2021.090424.
A. Marisa dan N. Yusof, "Factors influencing the performance of architects in construction projects," Constr. Econ. Build., vol. 20, no. 3, pp. 20–36, 2020, DOI 10.5130/AJCEB.v20i3.7119.
L. Zhao, J. Mbachu, dan Z. Liu, "Identifying Significant Cost-Influencing Factors for Sustainable Development in Construction Industry Using Structural Equation Modelling," Math. Probl. Eng., vol. 2020, 2020, DOI: 10.1155/2020/4810136.
H. Moon, T. P. Williams, H. S. Lee, dan M. Park, "Predicting project cost overrun levels in bidding stage using ensemble learning," J. Asian Archit. Build. Eng., vol. 19, no. 6, pp. 586–599, 2020, DOI: 10.1080/13467581.2020.1765171.
J. G. Sarhan, B. Xia, S. Fawzia, dan A. Karim, "Lean construction implementation in the Saudi Arabian construction industry," Constr. Econ. Build., vol. 17, no. 1, pp. 46–69, 2017, DOI: 10.5130/AJCEB.v17i1.5098.
H. Erol, I. Dikmen, dan M. T. Birgonul, "Measuring the impact of lean construction practices on project duration and variability: A simulation-based study on residential buildings," J. Civ. Eng. Manag., vol. 23, no. 2, pp. 241–251, 2017, DOI: 10.3846/13923730.2015.1068846.
J. Ratajczak, M. Riedl, dan D. T. Matt, "BIM-based and AR application combined with location-based management system for the improvement of the construction performance," Buildings, vol. 9, no. 5, 2019, DOI: 10.3390/buildings9050118.
M. N. Ugural dan H. I. Burgan, "Project performance evaluation using eva technique: Kotay bridge construction project on Kayto river in Afghanistan," Teh. Vjesn., vol. 28, no. 1, pp. 340–345, 2021, DOI: 10.17559/TV-20200114133619.
T. Omotayo, B. Awuzie, T. Egbelakin, L. Obi, dan M. Ogunnusi, "AHP-systems thinking analyses for kaizen costing implementation in the construction industry," Buildings, vol. 10, no. 12, pp. 1–24, 2020, DOI: 10.3390/buildings10120230
K. A. Chauhan dan R. A. Shah, "Application of time and motion study for performance enhancement of building construction industry," Int. J. Innov. Technol. Explor. Eng., vol. 8, no. 9 Special Issue, pp. 980–984, 2019, DOI 10.35940/ijitee.I1158.0789S19.
E. N. Shaqour, "The impact of adopting lean construction in Egypt: Level of knowledge, application, and benefits," Ain Shams Eng. J., no. xxxx, 2021, DOI 10.1016/j.asej.2021.07.005.
L. Zhang, X. Chen, dan Y. Suo, "Interrelationships among critical factors of work flow reliability in lean construction," J. Civ. Eng. Manag., vol. 23, no. 5, pp. 621–632, 2017, DOI 10.3846/13923730.2016.1217921.
C. Langston dan W. Zhang, "DfMA: Towards an integrated strategy for a more productive and sustainable construction industry in Australia,"Sustain., vol. 13, no. 16, 2021, DOI 10.3390/su13169219.
I. Antoniolli, P. Guariente, T. Pereira, L. P. Ferreira, dan F. J. G. Silva, "Standardization and optimization of an automotive components production line," Procedia Manuf., vol. 13, pp. 1120–1127, 2017, DOI: 10.1016/j.promfg.2017.09.173.
W. Al Balkhy, R. Sweis, dan Z. Lafhaj, "Barriers to adopting lean construction in the construction industry—the case of jordan," Buildings, vol. 11, no. 6, pp. 1–17, 2021, DOI: 10.3390/buildings11060222.
M. A. Hossain, A. Bissenova, dan J. R. Kim, "Investigation of wasteful activities using lean methodology: In perspective of kazakhstan's construction industry," Buildings, vol. 9, no. 5, 2019, DOI: 10.3390/buildings9050113.
E. S. Balashova dan E. A. Gromova, "Lean construction as an effective organization model in Arctic," MATEC Web Conf., vol. 117, no. February 2013, pp. 1–8, 2017, DOI 10.1051/matecconf/201711700011.
R. F. Aziz dan S. M. Hafez, "Applying lean thinking in construction and performance improvement," Alexandria Eng. J., vol. 52, no. 4, pp. 679–695, 2013, DOI 10.1016/j.aej.2013.04.008.
M. D. Andújar-Montoya, A. Galiano-Garrigós, V. Echarri-Iribarren, dan C. Rizo-Maestre, "BIM-LEAN as a methodology to save execution costs in building construction-An experience under the spanish framework,"Appl. Sci., vol. 10, no. 6, pp. 1–21, 2020, DOI 10.3390/app10061913.
M. J. Horman et al., "Delivering green buildings: Process improvements for sustainable construction," J. Green Build., vol. 1, no. 1, pp. 123–140, 2006, DOI 10.3992/jgb.1.1.123.
P. Orihuela, J. Orihuela, dan S. Pacheco, “Communication Protocol for Implementation of Target Value Design (TVD) in Building Projects,” Procedia Eng., vol. 123, pp. 361–369, 2015, DOI: 10.1016/j.proeng.2015.10.048.
S. Moaveni, S. Y. Banihashemi, dan M. Mojtahedi, "A conceptual model for a safety-based theory of lean construction," Buildings, vol. 9, no. 1, pp. 1–11, 2019, DOI 10.3390/buildings9010023.
Y. Hamdar, H. Kassem, I. Srour, dan G. Chehab, "Performance-Based Specifications for Sustainable Pavements: A Lean Engineering Analysis," Energy Procedia, vol. 74, pp. 453–461, 2015, DOI: 10.1016/j.egypro.2015.07.727.
U. H. Issa dan M. Alqurashi, "A model for evaluating causes of wastes and lean implementation in construction projects," J. Civ. Eng. Manag., vol. 26, no. 4, pp. 331–342, 2020, DOI 10.3846/jcem.2020.12323.
S. S. Silveira dan T. da C. L. Alves, "Target Value Design inspired practices to deliver sustainable buildings," Buildings, vol. 8, no. 9, 2018, DOI: 10.3390/buildings8090116.
M. M. Uddin, "Lean construction quality assurance opportunities in highway construction," IGLC 28 - 28th Annu. Conf. Int. Gr. Lean Constr. 2020, pp. 553–564, 2020, DOI 10.24928/2020/0013.
S. A. Wiraguna, M. B. Susetyarto, F. Lianto, dan S. H. Siwi, “Material module technology in Amartapura apartment, Lippo Karawaci,” IOP Conf. Ser. Mater. Sci. Eng., vol. 1007, no. 1, 2020, DOI 10.1088/1757-899X/1007/1/012097.
R. Li, Y. Zhou, Y. Xue, dan S. Han, "Local Structural Optimization Method Based on Orthogonal Analysis for a Resistant Muffler," IEEE Access, vol. 9, pp. 40560–40569, 2021, DOI: 10.1109/ACCESS.2021.3063768.
M. Taggart, L. Koskela, dan J. Rooke, "The role of the supply chain in the elimination and reduction of construction rework and defects: an action research approach," Constr. Manag. Econ., vol. 32, no. 7–8, pp. 829–842, 2014, DOI 10.1080/01446193.2014.904965.
H. Arshad, M. Qasim, M. J. Thaheem, dan H. F. Gabriel, "Quantification of material wastage in construction industry of Pakistan: An analytical relationship between building types and waste generation," J. Constr. Dev. Ctries., vol. 22, no. 2, pp. 19–34, 2017, DOI: 10.21315/jcdc2017.22.2.2.
S. Aslesen, S. Reff, dan E. Stordal, "How long does it take to build an apartment?," 27th Annu. Conf. Int. Gr. Lean Constr. IGLC 2019, no. 3, pp. 1309–1320, 2019, DOI 10.24928/2019/0236.
M. Carlton, "Mars Reconnaissance Orbiter, Ground Data System, receivables and deliverables (REC/DELs)," SpaceOps 2006 Conf., pp. 1–9, 2006, DOI 10.2514/6.2006-5879.
M. Sutrisna, C. D. D. Ramanayaka, dan J. S. Goulding, "Developing work breakdown structure matrix for managing offsite construction projects,"Archit. Eng. Des. Manag., vol. 14, no. 5, pp. 381–397, 2018, DOI: 10.1080/17452007.2018.1477728.
V. Elsye, Y. Latief, dan L. Sagita, "Development of Work Breakdown Structure (WBS) Standard for Producing the Risk Based Structural Work Safety Plan of Building," MATEC Web Conf., vol. 147, 2018, DOI: 10.1051/matecconf/201814706003.
M. W. A. S. Pratita dan Y. Latif, "Development of risk-based standardized WBS (Work Breakdown Structure) for quality planning of flyover works," Proc. Int. Conf. Ind. Eng. Oper. Manag., vol. 2018-March, pp. 2694–2710, 2018.
D. Rambabu, A. Lenin, G. B. Bhaskar, dan A. Gnanavel Babu, "Gap analysis and optimization of process involved in product design and development by integrating enterprise resource planning & product lifecycle management," Procedia Eng., vol. 64, pp. 983–992, 2013, DOI: 10.1016/j.proeng.2013.09.175.
F. A. Maulana dan Y. Latief, "Development of risk-based standardized WBS (work breakdown structure) for safety planning of coal mine project with surface mining methode," IOP Conf. Ser. Mater. Sci. Eng., vol. 1007, no. 1, 2020, DOI 10.1088/1757-899X/1007/1/012005.
P. D. Saputra dan Y. Latief, "Development of safety plan based on work breakdown structure to determine safety cost for precast concrete bridge construction projects. Case study: Girder erection with launching gantry method," Civ. Eng. Archit., vol. 8, no. 3, pp. 297–304, 2020, DOI: 10.13189/cea.2020.080313.
D. Ferakhim dan Y. Latief, "Development of safety cost for architectural works in rental apartments building construction project based on work breakdown structure," Int. J. Eng. Adv. Technol., vol. 8, no. 5C, pp. 16–27, 2019, DOI 10.35940/ijeat.E1003.0585C19.
I. Zharov dan J. Smirnova, "Multidimensional Modelling in the Educational Process Based on the Block Cluster Model," IOP Conf. Ser. Mater. Sci. Eng., vol. 661, no. 1, 2019, DOI 10.1088/1757-899X/661/1/012111.
K. Keskiniva, A. Saari, dan J. M. Junnonen, "Takt production monitoring and control in apartment renovation projects," Buildings, vol. 11, no. 3, pp. 1–18, 2021, DOI 10.3390/buildings11030092.
S. Cano dan O. Rubiano, "Dynamics model of the flow management of construction projects: Study of case," IGLC 28 - 28th Annu. Conf. Int. Gr. Lean Constr. 2020, no. 100, pp. 1045–1056, 2020, DOI: 10.24928/2020/0110.
C. J. Fourie dan N. E. Umeh, "Application of lean tools in the supply chain of a maintenance environment," South African J. Ind. Eng., vol. 28, no. 1, pp. 176–189, 2017, DOI 10.7166/28-1-1507.
M. Binninger, J. Dlouhy, J. Schneider, dan S. Haghsheno, "How Can Lean Construction Improve the Daily Schedule of A Construction Manager?," IOP Conf. Ser. Mater. Sci. Eng., vol. 245, no. 6, 2017, DOI 10.1088/1757-899X/245/6/062019.
Z. Dakhli dan Z. Lafhaj, "Efficient logistics enabled by smart solutions in tunneling," Undergr. Sp., vol. 2, no. 4, pp. 227–233, 2017, DOI: 10.1016/j.undsp.2017.10.004.
P. Nguyen dan R. Akhavian, "Synergistic Effect of Integrated Project Delivery, Lean Construction, and Building Information Modeling on Project Performance Measures: A Quantitative and Qualitative Analysis," Adv. Civ. Eng., vol. 2019, 2019, DOI 10.1155/2019/1267048.
T. Si, H. X. Li, Z. Lei, H. Liu, dan S. H. Han, "A Dynamic Just-in-Time Component Delivery Framework for Off-Site Construction," Adv. Civ. Eng., vol. 2021, 2021, DOI 10.1155/2021/9953732.
A. Herzanita, "Implementation of standardized wbs (work breakdown structure) for time and cost performance. (study case: Building project PT. X, Kuala Tanjung, Sumatera Utara),” IOP Conf. Ser. Mater. Sci. Eng., vol. 508, no. 1, 2019, DOI 10.1088/1757-899X/508/1/012049.
X. J. Li, "Research on investment risk influence factors of prefabricated building projects," J. Civ. Eng. Manag., vol. 26, no. 7, pp. 599–613, 2020, DOI 10.3846/jcem.2020.12917.
S. Tariq, N. Ahmad, M. Usman Ashraf, A. M. Alghamdi, dan A. S. Alfakeeh, "Measuring the Impact of Scope Changes on Project Plan Using EVM," IEEE Access, vol. 8, pp. 154589–154613, 2020, DOI: 10.1109/ACCESS.2020.3018169.
A. Behl dan A. Pal, "Interpretive Structural Modeling," vol. 26, no. 6, pp. 1–27, 2020, DOI: 10.4018/978-1-7998-2216-5.ch001