Cost Recovery Frameworks for Geothermal Projects: Insights from Oil and Gas and Their Relevance to PLN’s Geothermal Operations in Indonesia
Keywords:
PLN, GWA, GEECA, Cost recovery, oil and gas, geothermalAbstract
Some of PLN’s Geothermal Working Area (GWA) has suboptimal resource quality, which leads to high exploration costs and longer development times that hinder national geothermal targets. To address this, PT Perusahaan Listrik Negara (Persero) (PLN) has established a strategic partnership model called the Geothermal Exploration & Energy Conversion Agreement (GEECA) to improve efficiency and share exploration risks with partners, including cost recovery schemes similar to those in oil and gas. The development processes for oil, gas, and geothermal projects are similar: identifying reserves, exploration drilling, facility development, production, and site closure. The risks associated with geothermal, oil, and gas projects share similarities. The cost recovery scheme and GEECA include a mechanism for reimbursing exploration costs to partners or contractors. While they share fundamental concepts, the reimbursement methods differ significantly. In the cost recovery system, reimbursement occurs from production income before profits are shared between the government and the contractor. In contrast, GEECA employs a more definitive approach, ensuring that PLN will reimburse all exploration costs within two years after the power plant starts commercial operations. In Indonesia's geothermal development, especially with PLN's GWA, GEECA can enhance the appeal of partnerships. For other GWAs, PLN should consider enriching the data to reduce uncertainty and attract more partners.
Downloads
References
PT PLN (Persero), Laporan Keberlanjutan, 2022, unpublished.
PT PLN (Persero), Pengembangan Panas Bumi PLN, 2024, unpublished.
Presidential Regulation of Republik Indonesia No. 112, Percepatan Pengembangan Energi Terbarukan untuk Penyediaan Tenaga Listrik, 2022.
Soesanto E., Zaidaan R., Ahiraf S. A., Peran Cost Recovery pada Sektor Minyak dan Gas Bumi dalam Mendorong Pembangunan Ekonomi Nasional, Globe : Publikasi Ilmu Teknik, Teknologi Kebumian, Ilmu Perkapalan, Volume 2, Nomor 4 tahun 2024, pp: 307-316, e-ISSN: 3031-3503, p-ISSN: 3031-5018, doi: https://doi.org/10.61132/globe.v2i4.675, 2024.
Arifin, K., and Hidayat D., Cost Recovery Analysis in Production Sharing Contract in Upstream Oil and Gas Industry (Study on Gas Upstream Industries Indonesia), Dinasti International Journal of Economics, Finance & Accounting, Volume 1, Issue 6, Januari 2021, e-ISSN: 2721- 303X, p-ISSN: 2721-3021, 2021.
Lingard N., Morgan P., Apostolova K., and Tan J., Cost Recovery in Production Sharing Contracts: A comparative Review of Southeast Asian Jurisdictions, Journal of World Energy Law and Business, pp 1-16, doi: 10.1093/jwelb/jwaa033, 2020.
Pereira E.G., Fowler R., Stephens T., Elias-Roberts A., Lemos A., Zahari W. M. Z. W., Kamil R., and Kakimov N., Evolving Trends in Production Sharing Agreements & Cost Recovery Systems, Oil and Gas, Natural Resources, and Energy Journal, Volume 8, Number 3, 2023.
Roach B. and Dunstan A., The Indonesian PSC: The End of an Era, Journal of World Energy Law and Business, pp 116-135, doi: 10.1093/jwelb/jwy001, 2018.
Bramantio, B., Sumantri, H., Thamrin, S., and Sasongko, N.A., Analysis of Indonesia and New Zealand Geothermal Regulation, IOP Conference Series: Earth and Environmental Science, doi: 10.1088/1755-1315/926/1/012095, 2021.
Act No. 21, Panas Bumi, 2014.
Presidential Regulation of the Republik of Indonesia No. 22, Rencana Umum Energy Nasional, 2017.
Azmi U., Sasongko N. A., Murtiana S., Yanto S., Saputro G. E., Laksmono R., and Supriyadi I., A Holistic Overview : Indonesia’s Geothermal Energy Encourages Geothermal Power Plant Investment in Support of National Defense, Jurnal Pertahanan dan Bela Negara, Volume 14 Nomor 2 tahun 2014, 2014.
ESMAP, Comparative Analysis of Approaches to Geothermal Resource Risk Mitigation, 2016.
Setiawan, H., Geothermal Energy Development in Indonesia: Progress, Challenges and Prospect, International Journal on Advanced Science Engineering Information Technology, ISSN: 2088-5334, 2014.
PT PLN (Persero), Pengembangan Geothermal di Indonesia, 2025, unpublished.
Santos, I. M., Hamacher, S., Oliveira, F., A Systematic Literature Review for the Rig Scheduling Problem: Classification and State-of-the-art, Processors and Chemical Engineering, 2021.
Dewi, M.P., Setiawan A. D., Latief Y., and Purwanto W. W., Investment Decisions Under Uncertainties in Geothermal Power Generation, AIMS Energy, pp 844-857, doi: 10.3934/energy.2022038, 2022.
Saptarini, D. A. and Nainggolan, Y. A., Risk Management in Oil and Gas Field Development Project with Marginal Resources: A Case in Mature Field in East Kalimantan, European Journal of Business and Management Research, ISSN: 2507-1076, doi: 10.24018/ejbmr.2022.7.5.1629, 2022.
Suda, K.A., Rani N. S. A., Rahman H. A., and Chen W., A Review on Risks and Project Risks Management: Oil and Gas Industry, International Journal of Scientific & Engineering Research, Volume 6, Issue 8, August 2015, ISSN: 2229-5518, 2015.
Nusiaputra, Y.Y., Tondang, H.Y.T., and Yunis, Y. Institutionalized Public-private Partnership for Geothermal Development in Indonesia: Preliminary Approach of PLN Initiative, unpublished.
Nyokabi, J., Kilangi, J., Mathu, L., Mwakugu, S., and Nyoni, K.J., Geothermal Power Plants Project Finance through Public-Private Partnership: A Case of Africa, Proceedings World Geothermal Congress, 2023.
PT PLN (Persero), Geothermal Exploration & Energy Conversion Agreement, 2024, unpublished.
Loebs, B., ORMAT Signs Contracts For Two Geothermal Projects Under GEECA Scheme, Petromindo, https://www.petromindo.com/news/article/ormat-signs-contracts-for-two-geothermal-projects-under-geeca-scheme, 24 April 2025.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 ITB Graduate School Conference

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.