Conceptual Model of Integrated Spare Parts Inventory Management and Maintenance Scheduling at PT PLN Indonesia Power

Authors

  • Ardian Angga Pramono PT PLN (Persero), PT PLN Indonesia Power
  • Andi Cakravastia Arisaputra Raja Institut Teknologi Bandung

Keywords:

Inventory Management, Corrective Maintenance, Preventive Maintenance, Stock Review Interval, Lost kWh, Model Development, Model Conceptual

Abstract

PT PLN Indonesia Power is facing issues of delays and stockouts of bearing spare parts, which negatively affect the power plant maintenance schedule. This study aims to develop a conceptual model that integrates spare parts inventory management and preventive maintenance scheduling to address these problems. The research is conducted by enhancing the existing model, which applies an inventory policy with fixed (static) stock review intervals and preventive maintenance schedules. This study proposes to make the preventive maintenance schedule a decision variable. Additionally, the developed model specifically integrates the cost of lost electricity production (lost kWh) due to spare parts stockouts as part of the operational costs to be optimized.

Downloads

Download data is not yet available.

References

Shigley, J. E, McGraw-Hill. Mechanical Engineering Design (3rd ed.). Publisher 1997 (Book)

W.Wang, A stochastic model for joint spare parts inventory and planned maintenance optimisation, European J. Oper. Res. 216(1)(2012)127–139, http://dx.doi.org/10.1016/j.ejor.2011.07.031. (Journal)

Van Horenbeek, A.; Buré, J.; Cattrysse, D.; Pintelon, L.; Vansteenwegen, P. Joint maintenance and inventory optimization systems:

A review. Int. J. Prod. Econ. 2013, 143, 499–508 (Journal)

Vincent F.Yu, Nabila Yuraisyah Salsabila, Nurhadi Siswanto, Po-Hsun Kuo, A two-stage Genetic Algorithm for joint coordination of spareparts inventory and planned maintenance under uncertain failures, Applied Soft Computing, 17 October 2022 (Journal)

H A. Taha, Operation Research An Introduction, Pearson, 2017 (Book)

H.G. Daellenbach, D.C.Mc Nickle, Management science, Decision making through systems thinking, Palgrave macmillan, 2005 (Book)