PT PLN (Persero) carries out distribution network maintenance activities to ensure the reliability of the electricity distribution system. The material distribution system for maintenance operations at PLN follows a twoechelon structure, consisting of deliveries from suppliers to the Customer Service Implementation Unit (UP3), and subsequently to the Customer Service Units (ULP). This study aims to develop a distribution model for medium- and lowvoltage maintenance materials that considers both transportation and storage costs. The problem is formulated as a Binary Non-Linear Programming (BNLP) model, which is inherently complex and computationally intensive. To address this, a heuristic approach based on the Silver-Meal method is proposed, offering a relatively fast solution to the BNLP model, although it does not always guarantee global optimality. Since the traditional Silver-Meal method does not account for transportation costs, modifications are introduced in this study. The modified Silver-Meal heuristic is applied to the two-echelon distribution problem to evaluate and demonstrate the effectiveness of the proposed approach.
Downloads
References
Bahagia, S. N., (2006), “Sistem Inventory”, Penerbit Institut Teknologi Bandung (121-122).
Asli, Berren., (2025). Application of the Non-Dominated Sorting Genetic Algorithm II (NSGA-II) in a Two-Echelon Cold Supply Chain, Article Sakarya University. 13, 206. https://doi.org/10.3390/systems13030206.
Ikasari, et al., (2018). Inventory control analysis of frozen processed shrimp using silver meal heuristic method, International Conference on Green Agro-industry and Bioeconomy. doi:10.1088/1755-1315/131/1/012024.
E Prasetya, et al., (2021). Inventory control of raw material using silver meal heuristic method in PR. Trubus Alami Malang, International Conference on Green Agro-industry and Bioeconomy. doi:10.1088/1755-1315/733/1/012062.
Sebatjane, M. (2025) Inventory optimisation in a two-echelon cold chain: Sustainable lot-sizing and shipment decisions under carbon cap emissions regulations. Operations Research. https://doi.org/10.1007/s10479-025-06466-2.
Yifan, Zhou., (2024). Optimization of multi-echelon spare parts inventory systems using multi-agent deep reinforcement learning, International Journal Mathematical Modelling. 827-844.
Nekooghadirli, N., Tavakkoli, R., (2014). solving a new bi-objective location-routing-inventory problem in a distribution network by metaheuristics,. Journal Computer and Industrial Engineering 204-221.
Felani, M. I., (2017) Optimizing Supply Chain Management in Coal Power Generation, International Conference on Operations Research and Enterprise Systems, 460-463.
Rohaninejad, M,. (2018). Multi-echelon supply chain design considering unreliable facilities with facility hardening possibility, International Journal, 321-337. https://doi.org/10.1016/j.apm.2018.06.001.