Techno-Economic Assessment of Solar Power Plants Development as Auxiliary System Supply at 150 kV Ciledug Substation

Authors

  • Dian Priyatno PT Perusahaan Listrik Negara (Persero)
  • Poetro Lebdo Sambegoro Faculty of Mechanical and Aerospace Engineering, Institut Teknonogi Bandung

Keywords:

energy transition, Substation, solar power plant, PVSyst, HOMER, LCOE

Abstract

PT PLN as the largest electricity provider in Indonesia has an important role in accelerating the energy transition to achieve Net Zero Emission (NZE) by 2060 as Indonesia's commitment in the Paris Agreement. Substation as a link between electrical energy from generators distributed to consumers in the transmission system have not implemented the "green" concept in their operations.

Ciledug 150 kV Substation in Tangerang has an empty land area of ​​1860 m² with a solar radiation intensity of 4.5 kWh/m²/day. The potential for solar energy in this location can be utilized to supply auxiliary system, thereby reducing the cost of burden and improving system reliability. To implement the planning of Solar Power Plant at GI Ciledug 150 kV, a study was conducted from the technical and economic aspects using the Pvsyst and HOMER.

From the research results, the most optimal configuration for the planning of the development of GI 150 kV Ciledug Solar Power Plant development is the Grid PLN-PLTS scenario, The Grid PLN-PLTS configuration yielded positive values for IRR and Payback Period, which are 13.6% and 6.79 years. Meanwhile, the LCOE value of this configuration is the lowest at Rp 533.62 / kWh with an EBT fraction of 65%.

Downloads

Download data is not yet available.

References

Vikram Surya Husada and Iwan Erar Joesoef, “LEGAL POLICY OF THE INDONESIAN GOVERNMENT TO ACHIEVE NET ZERO EMISSIONS,” Journal Research of Social Science, Economics, and Management, vol. 02, pp. 128–133, 2022.

K. Moudene and E. Ridouane, “Renewable Energies and Sustainable Development,” International Journal of Economics, Business and Management Research, vol. 08, no. 08, pp. 96–116, 2024, doi: 10.51505/ijebmr.2024.8806.

N. Pasaribu, Rusdianasari, and A. Syarif, “Efficiency of 9KWp Sun Tracking Photovoltaic in Palembang, Indonesia,” in IOP Conference Series: Earth and Environmental Science, Institute of Physics Publishing, Nov. 2019. doi: 10.1088/1755-1315/347/1/012129.

K. Rafhel Panjaitan, I. Ayu Dwi Giriantari, I. Nyoman Setiawan, J. Raya Kampus Unud Jimbaran, K. Kuta Selatan, and K. Badung, “KEMENTERIAN ESDM REPUBLIK INDONESIA JAKARTA PUSAT,” 2023.

W. Nababan, H. V. Sihombing, H. Kawai, and H. Ambarita, “Contribution of Solar Photovoltaic on the Reduction of Greenhouse Gas Emission in the Indonesia Power Sector,” in IOP Conference Series: Materials Science and Engineering, Institute of Physics Publishing, Oct. 2019. doi: 10.1088/1757-899X/648/1/012028.

A. Dwijatmiko et al., “Optimizing Electricity Supply for Jawa-Madura-Bali: Scenarios for Achieving Net Zero Emissions,” Evergreen, vol. 11, no. 3, pp. 2567–2579, Sep. 2024, doi: 10.5109/7236897.

W. de Araujo Silva Júnior et al., “Characterization of the Operation of a BESS with a Photovoltaic System as a Regular Source for the Auxiliary Systems of a High-Voltage Substation in Brazil,” Energies (Basel), vol. 16, no. 2, Jan. 2023, doi: 10.3390/en16021012.

Solargis, “Data Iradiasi Matahari di GI 150 kV Ciledug,” 2023.

Global Solar Atlas, “Global Solar Atlas.” Accessed: May 02, 2025. [Online]. Available: https://globalsolaratlas.info/map?s=-6.211855,106.680355&m=site&c=-6.211855,106.680355,11

S. Ghosh, J. N. Roy, and C. Chakraborty, “A model to determine soiling, shading and thermal losses from PV yield data,” Clean Energy, vol. 6, no. 2, pp. 1137–1156, Apr. 2022, doi: 10.1093/ce/zkac014.

Published

2025-10-29

How to Cite

Priyatno, D., & Sambegoro, P. L. (2025). Techno-Economic Assessment of Solar Power Plants Development as Auxiliary System Supply at 150 kV Ciledug Substation. ITB Graduate School Conference, 5(1). Retrieved from https://gcs.itb.ac.id/proceeding-igsc/index.php/igsc/article/view/529