Fauzy, M. I. B. and Dewi, R. G. (2025) “Techno-Economic Feasibility Study of CCUS Implementation and Biomass Co-Firing System for Teluk Balikpapan Coal-Fired Power Plant (CFPP)”, ITB Graduate School Conference, 5(1), pp. 842–855. Available at: https://gcs.itb.ac.id/proceeding-igsc/index.php/igsc/article/view/629 (Accessed: 12 September 2026).