ASHADI, R. F.; HUSIN, A. E.; GUNTOROJATI, I. Scheduling of Infrastructure Construction Projects Using the Manual-Program Evaluation and Review Technique (M-Pert) Method Case Study: Indonesian Sunda Strait Bridge. ITB Graduate School Conference, [S. l.], v. 1, n. 1, p. 76–82, 2022. Disponível em: https://gcs.itb.ac.id/proceeding-igsc/index.php/igsc/article/view/9. Acesso em: 5 oct. 2025.