Fauzy, M. I. B., & Dewi, R. G. (2025). Techno-Economic Feasibility Study of CCUS Implementation and Biomass Co-Firing System for Teluk Balikpapan Coal-Fired Power Plant (CFPP). ITB Graduate School Conference, 5(1), 842–855. Retrieved from https://gcs.itb.ac.id/proceeding-igsc/index.php/igsc/article/view/629