[1]
Fauzy, M.I.B. and Dewi, R.G. 2025. Techno-Economic Feasibility Study of CCUS Implementation and Biomass Co-Firing System for Teluk Balikpapan Coal-Fired Power Plant (CFPP). ITB Graduate School Conference. 5, 1 (Oct. 2025), 842–855.