Improvement of Voltage Regulation on the 150kV Isolated System: Study Case of Isolated Ketapang System
Keywords:
shunt reactorAbstract
The Isolated transmission line in the Ketapang system is one of several systems in the Khatulistiwa, West Kalimantan system that is still not connected to the main grid. Due to the long distance, low load and there is no large plant in the Ketapang isolated system there is potential for a voltage violation on isolated transmission lines in the Ketapang system above the service voltage limit. With the 150 kV nominal voltage still not up to standard (average 127 kV), it is necessary to improve service. This improvement in service certainly needs to be balanced with an increase in equipment performance, therefore it is necessary to improve methods.
Downloads
References
Badan Pusat Statistik, “Kalimantan Barat Province in Figures”, BPS-Statistic of Kalimantan Barat Province. Kalimantan Barat: vol. 41, pp. 519, 2024.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 ITB Graduate School Conference

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
